Top Challenges Homeowners Face When Building ADUs (and How to Overcome Them)

October 9, 2025
ADU Framing

Additiional Dwelling Units (ADUs) are one of the fastest-growing trends in California home construction. They provide a flexible way to add living space, increase property value, and generate rental income — all while adapting to the growing housing demand. But as exciting as building an ADU can be, homeowners often face significant challenges along the way.

At Coleman Build, we’ve helped many homeowners navigate these obstacles smoothly. Below, we highlight the most common challenges and how you can overcome them to ensure your ADU project is a success.

1. Navigating the Permitting and Approval Process

For many homeowners, the permitting process is one of the most complex parts of building an ADU. California cities have different rules for ADU size, setbacks, parking requirements, and utility connections. Additionally, some municipalities require design reviews or compliance with specific zoning codes.

This complexity can cause confusion and delay if not addressed early. Missteps in the permitting process often result in costly rework and extended timelines.

How to Overcome:

  • Work with experienced contractors. Coleman Build’s team is familiar with local ADU codes and can guide you through the process from start to finish.
  • Engage with your city early. Before finalizing your design, speak to your local planning department to understand specific requirements.
  • Use a design-build approach. This integrates design and construction planning into one process, reducing delays and ensuring compliance.

Example: A recent Coleman Build client in Los Angeles faced complex zoning requirements for a detached ADU. By involving the permitting process early and collaborating with city officials, we avoided delays and ensured the project met all legal requirements.

2. Budgeting and Unexpected Costs

Cost is a top concern for homeowners building an ADU. While pricing can vary widely depending on size, design, location, and finishes, there are often hidden costs that can surprise homeowners — such as utility upgrades, site work, or code compliance costs.

Without proper budgeting, these expenses can derail a project.

How to Overcome:

  • Plan a realistic budget. Include a contingency of 10–15% to cover unexpected costs.
  • Get clear estimates early. Coleman Build provides transparent cost breakdowns, so homeowners understand where their money goes.
  • Consider phased construction. If budget flexibility is an issue, build the ADU in stages to manage costs.

Example: For one ADU project, a homeowner initially underestimated site grading costs. By planning with a contingency and working closely with Coleman Build, they adjusted without compromising the project’s quality.

3. Site Constraints and Property Layout

Every property is unique, and site conditions can significantly influence the design and cost of an ADU. Issues such as limited lot size, steep grades, existing structures, and utility access can create challenges. In addition, parking requirements or setback rules may limit where you can place your ADU.

How to Overcome:

  • Conduct a thorough site evaluation. Before starting design, assess property limitations with a contractor and an engineer.
  • Work with architects to develop creative solutions. Compact layouts, multi-story ADUs, or prefabricated units can maximize space efficiency.
  • Consider detached or garage-conversion ADUs. These options can be ideal for constrained sites.

Example: A homeowner with a tight lot in Los Angeles wanted a detached ADU. Coleman Build designed a compact, two-story unit that fit within setback rules while maximizing usable space.

4. Timeline and Coordination Issues

Building an ADU is a complex process that involves design, permits, construction, and inspections. Delays can happen if these phases are not coordinated well, impacting the overall timeline and cost.

How to Overcome:

  • Choose a contractor experienced in ADU project management. Coleman Build’s project managers ensure each step stays on track.
  • Set a clear timeline. Break down the project into milestones and communicate them with all stakeholders.
  • Maintain ongoing communication. Regular updates keep homeowners informed and help address issues before they escalate.

Example: In one project, delays were caused by a slow permitting process. Coleman Build mitigated this by maintaining close contact with the city and adjusting the construction schedule to avoid downtime.

Bonus Tip: The Value of Professional Guidance

One of the biggest mistakes homeowners make when building ADUs is trying to navigate the process alone. The right team can make all the difference. A knowledgeable contractor can help you:

  • Understand local regulations
  • Avoid costly mistakes
  • Design a unit that maximizes value
  • Keep the project on budget and on time

At Coleman Build, we combine technical expertise, design creativity, and a client-first approach to make the ADU process stress-free.

Conclusion

Conclusion

Building an ADU can be a rewarding way to expand your living space, boost property value, and create rental income opportunities. But it comes with challenges — from permits and budgets to site constraints and timelines. With careful planning and the right construction partner, you can overcome these obstacles.

Coleman Build specializes in guiding homeowners through every step of ADU construction. From concept to completion, we ensure your ADU is built to your vision, on time, and on budget.

If you’re ready to transform your property with an ADU, contact Coleman Build today. Let’s make your vision a reality.

If you’re ready to transform your property with an ADU, contact Coleman Build today. Let’s make your vision a reality.